Location: Los Angeles, California
Type: New Tower (Concrete Structure)
No. Cells: 5
Fill Material: Ceramic Block Tile (CBT)
Design Conditions: 97°F(HWT) – 85°F(CWT) – 73°F(WBT)
Cooling Capacity: 5,500 tons (16,500 GPM)
Project Completion: 2007