Location: Seattle, Washington
Type: New Tower (Concrete Structure)
No. Cells: 3
Fill Material: Ceramic Block Tile (CBT)
Design Conditions: 95°F(HWT) – 85°F(CWT) – 67°F(WBT)
Cooling Capacity: 10,125 tons (20,250 GPM)
Project Completion: 2002
Location: Seattle, Washington
Type: New Tower (Concrete Structure)
No. Cells: 3
Fill Material: Ceramic Block Tile (CBT)
Design Conditions: 95°F(HWT) – 85°F(CWT) – 67°F(WBT)
Cooling Capacity: 10,125 tons (20,250 GPM)
Project Completion: 2002