Location: Tampa, Florida
Type: New Tower (Concrete Structure)
No. Cells: 2
Fill Material: Ceramic Block Tile (CBT)
Design Conditions: 95°F(HWT) – 85°F(CWT) – 80°F(WBT)
Cooling Capacity: 2,000 tons (6,000 GPM)
Project Completion: 2005
Location: Tampa, Florida
Type: New Tower (Concrete Structure)
No. Cells: 2
Fill Material: Ceramic Block Tile (CBT)
Design Conditions: 95°F(HWT) – 85°F(CWT) – 80°F(WBT)
Cooling Capacity: 2,000 tons (6,000 GPM)
Project Completion: 2005