Location: College Station, Texas
Type: New Tower (Concrete Structure)
No. Cells: 6
Fill Material: Polyvinylchloride (PVC)
Design Conditions: 96°F(HWT) – 86°F(CWT) – 79°F(WBT)
Cooling Capacity: 10,275 tons (30,825 GPM)
Project Completion: 2014
Location: College Station, Texas
Type: New Tower (Concrete Structure)
No. Cells: 6
Fill Material: Polyvinylchloride (PVC)
Design Conditions: 96°F(HWT) – 86°F(CWT) – 79°F(WBT)
Cooling Capacity: 10,275 tons (30,825 GPM)
Project Completion: 2014